PV MANUFACTURING EQUIPMENT
My account中国工厂入驻 Create RFQ

Zhejiang Guozi Robotics Co., Ltd.

浙江国自机器人技术股份有限公司

Whole-workshop material flow for solar-cell lines: mobile robots, arms, conveyors and buffers tied together by material and dispatch software.

Supplier at a glance

Location
Hangzhou, Zhejiang
Equipment listed here
Cell material handling
Profile sources
3 named sources; source list
Manufacturer website ↗
Jump to a section

What the company makes

Zhejiang Guozi Robotics says it was founded in 2011 and has its head office in Hangzhou. It works in three areas: intelligent logistics, inspection and manufacturing.

Its PV case is an operating solar-cell plant in Jiangsu. Guozi does not name the customer, so the case is best read by its location and the process steps it covers.

What a cell maker buys from Guozi is a coordinated handling system that runs between the production machines. The robot fleet is one piece of that delivery, alongside arms, conveyors, buffers and the software that schedules them.

Company scope sources: [1]

Start with the actual equipment

The entries below cover selected products and series from this manufacturer. Ask for the full catalogue if your project needs other models.

How baskets travel through the Jiangsu cell plant

  1. Texturing to printing to packaging

    In Guozi's case, loaded and empty baskets move from texturing through screen printing and on to packaging. AGVs, robot arms, conveyors and work-in-process buffers share the work. The layout also leaves room for consumable changes, machine maintenance and later technology upgrades. Moving one basket is easy; a factory system also has to handle returns, fill and drain buffers and route around machines that are down. Mark each of those basket states and every handover point on your project flow diagram. [1]

  2. Installed while the plant kept running

    Guozi says it carried out the project with production still running and points to narrow working aisles. Laser SLAM and visual positioning guided the robots. That makes it a fit-into-the-existing-building job, a different task from laying out a new warehouse. For your plant, ask for a phased plan: work zones, temporary routes, commissioning windows and the points where production machines must be stopped or isolated. [1]

  3. MCS and RCS split the software work

    The case names a material management system (MCS) and a robot control system (RCS). They connect through demand generation, task management and route planning. That split helps you assign software responsibility. Material stock, basket identity and buffer status all have to stay in step with the moves the robots actually make. Agree who connects to your production system, which events get logged and how a failed or hand-finished move is matched back to the records. [1]

Guozi helped draft the national control-interface standard

Drafting role in GB/T 43047-2023

China's national standards platform names Zhejiang Guozi Robotics Technology among the organisations that drafted GB/T 43047-2023, the technical specification for logistics robot control-system interfaces. It is a recommended national standard, published in September 2023 and in force since April 2024. This tells you Guozi has worked on interface rules at a national level. For your project, ask which interface standard and version the offered system follows and what test documents will come with it. [3]

Match the offering to your project

Best suited to a cell plant already in production, with frequent basket moves, tight aisles and many machine interfaces to serve.

If you only want a single robot datasheet, this case gives you less: the fleet models, buffers and software are chosen per site. Guozi's general lifting-robot catalogue lists many models, so ask which ones a PV project of your size would use.

Confirm before ordering

  • The customer name, a signed acceptance report and the baseline behind the improvement percentages quoted in the case.
  • A site design covering the proposed fleet, basket interface, buffer sizes and charging plan.
  • A project safety assessment, an interface conformance report and the terms of the support agreement.

Based on Guozi's solar-cell case, its company overview and the GB/T 43047-2023 record; the case's percentage gains are left out until their baseline is supplied.

Approvals on file

No factory audit or equipment certificate is on file for this manufacturer yet. Ask for current certificates, with their scope and validity, in your quotation request.

Your Solar cell workshop material handling system enquiry checklist

Tick the questions that apply to your project, then take them into your sourcing request. Ticking an item here does not contact the manufacturer.

0 of 4 items prepared

Your selections remain on this page and are cleared on reload. Download or print to keep a copy. No checklist selections are uploaded.

Continue to sourcing request

Buyer questions

Will my plant also avoid stopping production during installation?

The case shows Guozi working inside a running site. Your own phasing and isolation needs are planned for your plant, so ask for that plan with the quote. [1]

What does Guozi's role in GB/T 43047-2023 mean for me?

It shows Guozi helped write the standard. For your order, ask for test records covering the models and the installation you buy. [3]

How should a trial test an interrupted cell-material transfer?

Describe the real container or boat, the station handover and the tracking IDs. Agree a safe stop and recovery test with the receiving station, and record who owns the material state while it recovers. Robot moving capacity on its own says little about whether a transfer finishes with full traceability.

Where this information comes from

Covers the Jiangsu solar-cell case, company background and the interface standard; plant performance and conformance are confirmed per project.

Company facts come from the publications listed below, each with the date it was checked. The project-fit notes and enquiry checklist are our buying guidance.

  1. Guozi solar-cell workshop case ↗Manufacturer case study · Checked 2026-10-07

    Jiangsu plant, basket route, software and retrofit approach; customer not named.

  2. Guozi company overview ↗Company website · Checked Saved 2026-09-26; checked again 2026-10-07

    Founding year, head office and business areas.

  3. GB/T 43047-2023 control-system interface standard ↗National standards platform · Checked 2026-10-07

    Standard name, dates and drafting organisations.

Report a correction · How we prepare listings · Represent this manufacturer?

Build a useful enquiry

Start with the documented equipment, then define the configuration and acceptance criteria for your project.

Prepare the checklist ↓

Saving or comparing does not send a request. The next screen handles account access and the actual sourcing workflow.

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.