Shenzhen S.C New Energy Technology Corporation
深圳市捷佳伟创新能源装备股份有限公司
For cell lines that need tunnel oxide and polysilicon, S.C New Energy offers a plasma tube furnace that grows all three layers in one tube, beside a wide range of wet, plate and laser tools.
Supplier at a glance
- Location
- Shenzhen, Guangdong
- Equipment listed here
- Deposition systems
- Profile sources
- 3 named sources; source list
Company scope
What the company makes
Shenzhen S.C New Energy Technology, 捷佳伟创 in Chinese, sells wet, tube, plate, laser and metallization equipment, plus whole lines and perovskite tools. Its 2025 annual-report summary shows a Shenzhen listing under code 300724. Despite the similar abbreviation, it is a different company from Suzhou SC SOLAR.
The tool covered here is the tube plasma polysilicon deposition furnace. S.C New Energy publishes it as a process family, so batch capacity and utility figures arrive with a configured quotation.
Company scope sources: [1]
Equipment portfolio
Start with the actual equipment
The entries below cover selected products and series from this manufacturer. Ask for the full catalogue if your project needs other models.
Tube plasma polysilicon deposition furnace →
S.C New Energy's tube plasma polysilicon deposition furnace grows tunnel oxide, intrinsic polysilicon and doped polysilicon in one process tube. The company points to controlled doping, light wraparound deposition and a non-hot-wall design. Wafer format and output are set when the furnace… [2]
Specifications & selection questions →Furnace features
Three layers in one tube, and what to pin down
Tunnel oxide, i-poly and D-poly
According to the furnace page, tunnel oxide, i-poly and D-poly can all be completed in the same tube. S.C New Energy credits this with fewer process steps and less wafer breakage. For a quotation, settle which layer sequence and wafer conditions the proposed recipe covers, and which steps stay outside the furnace. The page gives no layer thicknesses, wafer load, deposition time or yield results, so ask for them from trials on your process. [2]
Tube life, wraparound and doping
The company also lists a non-hot-wall design, longer quartz-tube life, light wraparound deposition that is easier to remove, precise doping and an anti-conduction technology. Each needs its own check. Tube life depends on operating and cleaning conditions. Wraparound needs a defined surface and removal standard. Doping needs a target profile and a measurement method. Ask for a documented trial on the offered process before you set maintenance intervals or efficiency targets. [2]
Wider portfolio
Other S.C New Energy tools are quoted separately
Wet, plate and perovskite tools
The company site also covers texturing, HJT plate PECVD, PVD, RPD and perovskite coating and printing, listed apart from the tube range, along with pilot-line work. That breadth helps you reach the right technical team. Every station is its own machine, so ask for the product document of each extra station you plan to buy, and check whether a pilot-line tool has already run in volume production for a customer. [1]
Gas, exhaust and safety package
The furnace page gives no data on gas delivery, exhaust, vacuum, electrical supply or interlocks. For a plasma deposition furnace, these items shape both the equipment scope and site preparation. Ask S.C New Energy to list which gas systems, pumps, exhaust treatment and safety interfaces are in the offer and which ones you must supply yourself. [2]
2025 report summary
Who you are buying from
Legal name, listing and office
The 2025 annual-report summary on CNINFO names the company, stock code 300724 on the Shenzhen Stock Exchange, and an office on Jinniu East Road in Pingshan. Use it to confirm the contracting company. The purchase documents should also name the plant that assembles the furnace, the site for sample tests and the legal entity responsible for the order. [3]
Project fit
Match the offering to your project
Cell makers who have defined their tunnel-oxide and polysilicon sequence, and know where integration should stop, can approach S.C New Energy with a concrete request.
Capacity planning needs the configured quotation. When you compare this furnace with another deposition system, hold wafer load, cycle definition, film targets and ancillary equipment the same for both.
Confirm before ordering
- Model name, tube and load configuration, and the full utilities package for the offered furnace.
- Trial results for film thickness and uniformity, doping and particles, and the conditions behind the tube-life figure.
- Acceptance terms for the delivered furnace, factory inspection arrangements and site-specific safety documents.
S.C New Energy (Shenzhen, code 300724) is a separate company from Suzhou SC SOLAR; furnace features come from its own product page.
Certificates & approvals
Approvals on file
No factory audit or equipment certificate is on file for this manufacturer yet. Ask for current certificates, with their scope and validity, in your quotation request.
Prepare before contacting
Your Tube plasma polysilicon deposition furnace enquiry checklist
Tick the questions that apply to your project, then take them into your sourcing request. Ticking an item here does not contact the manufacturer.
Your selections remain on this page and are cleared on reload. Download or print to keep a copy. No checklist selections are uploaded.
Continue to sourcing requestBuyer questions
Are S.C New Energy and SC SOLAR the same company?
No. S.C New Energy is 捷佳伟创 in Shenzhen, listed under code 300724. Suzhou SC SOLAR is a different supplier. [3]
Does the three-in-one furnace make up a full cell line?
It runs three layer steps in one tube. Other process stations, load capacity and the recipe each need their own documents. [2]
How should a furnace offer be split from handling automation?
Ask for the reactor set-up, process gas and utilities, loading arrangement and measurement plan as separate scope items, and agree film and wafer acceptance for your process. Loader speed and family-level furnace data tell you little about the layers the selected tube will deposit.
Sources
Where this information comes from
Company identity matches the 2025 report summary; model, recipe and installation details come with a configured quotation.
Company facts come from the publications listed below, each with the date it was checked. The project-fit notes and enquiry checklist are our buying guidance.
- S.C New Energy company and equipment portfolio ↗Manufacturer website · Checked Saved 2026-09-26; checked again 2026-10-07
Equipment categories and development offerings.
- Tube plasma polysilicon deposition furnace ↗Manufacturer product page · Checked Checked 2026-10-07
Same-tube process and listed technical features.
- S.C New Energy 2025 annual-report summary ↗Company filing on CNINFO · Checked Company information section, 2026-10-07
Legal name, stock listing and office location.
Report a correction · How we prepare listings · Represent this manufacturer?
Build a useful enquiry
Start with the documented equipment, then define the configuration and acceptance criteria for your project.
Prepare the checklist ↓Saving or comparing does not send a request. The next screen handles account access and the actual sourcing workflow.