PV MANUFACTURING EQUIPMENT
My account中国工厂入驻 Create RFQ

EQUIPMENT SERIES

PV module manufacturing solution

Wuxi Lead Intelligent Equipment Co., Ltd. ↗

LEAD sells a PV module line built around its stringers, with integration for TOPCon, XBC and HJT production. The image on the page is a line layout. Capacity for your factory follows from your recipe and the station list LEAD quotes.

Line solution. Split the quote into process equipment, logistics, inspection and factory software, and keep group-wide efficiency figures out of the machine specification.

General illustration of module assembly equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.

START WITH YOUR PRODUCTION TASK

Ask LEAD to quote against one defined module recipe, shift calendar and accepted output target. Get every station and the owner of each handover in writing before you accept a turnkey price.

SOURCE-LINKED DATA

Published specifications

Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.

Manufacturer catalogue values
ParameterPublished valueSource check
Compatible cell size156–230 mm2026-09-26
Cell processesTOPCon, XBC and HJT2026-09-26

See sources and check dates ↓

01 · PVYard procurement analysis

What a LEAD turnkey quote should list

  • Process and inspection stations

    List the stringer, the bussing machine and every other process or inspection station offered. For each one, get the configuration and the acceptance test for your module design.

  • Integration and site work

    Split out transfers, logistics, MES, utilities, installation and the work you handle yourself. A full line drawing leaves open who delivers each interface, so ask LEAD to name the owner.

Source: LEAD PV module manufacturing solution page

02 · PVYard procurement analysis

Working out line capacity

Working out line capacity
StepPut in your briefAsk LEAD to show
Cells to stringsCell technology, cells per string and interconnection.Stringer output with checks and rejects counted.
Module layoutStrings per module, geometry and stack.Capacity of downstream stations on that layout.
Lamination and final testLaminating recipe and the inspection you require.Bottleneck, buffers and first-pass accepted modules.
Annual outputShifts, operating days, stops and power per module.A step-by-step calculation behind any GW figure.

Source: LEAD PV module manufacturing solution page

03 · PVYard procurement analysis

Accepting the line in stages

  1. Fix the boundary

    Freeze the responsibility matrix, model list and data and transfer interfaces before manufacture starts.

  2. Prove the recipe

    Run representative cells and module materials to settle process and inspection results.

  3. Run the linked line

    Count accepted modules with real handovers, buffers and stoppages in the run.

  4. Change product

    Switch to the required variant and record recipe control, the first good module and the records handed to your factory.

Source: LEAD PV module manufacturing solution page

04 · PVYard procurement analysis

Brief for a LEAD module line

  • Recipe and formats

    Attach cell, string and module drawings and your planned variants.

  • Output calendar

    Give the accepted modules needed, shifts, operating days and how downtime is counted.

  • Layout and interfaces

    Send the plant layout and request a station-by-station responsibility matrix.

  • Acceptance and handover

    Set inspection, sustained run, changeover, training, spares and the documents that identify the delivered line.

Source: LEAD PV module manufacturing solution page

TURN THIS INTO A CLEAR REQUEST

Ask about this product

Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.

Sources

Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.

LEAD PV module manufacturing solution page ↗

Source check: 2026-10-11 · Cell technologies, cell size range and the line layout illustration.

Report a correction · How we prepare listings

Compare equipment for a related task

These entries are in the same category; check each one's specifications and configuration.

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.