HORAD junction-box lid snap-fitting station

Suzhou HORAD New Energy Equipment Co., Ltd. ↗

This station closes junction boxes after potting. Servo correction squares the panel, lids feed in without stopping the machine, and two robots work in parallel so placing and capping overlap.

HORAD gives the robot arrangement, the three detection routes, panel sizes, electrical and air supply, footprint and weight. It lists no lid and box models, pressing force window, latch criterion or cycle time; request those with the quote. Lid capping is one of the last junction-box steps in module assembly.

General illustration of module assembly equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.

START WITH YOUR PRODUCTION TASK

Suited to lines still pressing junction-box lids by hand. Send HORAD your lid and box drawings, define what a fully latched lid looks like, and test every detection route with lids that are missing, tilted or half seated. Lids go on once the potting compound has been dosed, so ask how long the compound must settle before the station presses down.

SOURCE-LINKED DATA

Published specifications

Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.

The manufacturer has not published a complete specification table for this entry. Request the exact offered drawing and operating limits.

See sources and check dates ↓

01 · Manufacturer information

Two robots, three checks

HORAD describes automatic snap fitting of the lid, servo correction of the panel position and lid loading that continues while the station runs. Because there are two robots, one can set down material while the other presses a lid, and pressure sensing on the robot closes the control loop.

Three checks follow: vacuum detection, an upper camera and a side camera that reinspects the box. Each one can catch a different fault, yet HORAD does not say which faults each covers, what thresholds apply or where rejects go. HORAD also says it suits various lids, so ask for the box and lid models it has been set up for and agree a latch check that sits alongside the pressure reading.

Source: HORAD junction-box lid capping product page

02 · Manufacturer information

Capping station data and what to define

Capping station data and what to define
ItemHORAD figureDefine with HORAD
RobotsDual robots; placing and capping at onceLid feed and the motion sequence on a drawing.
DetectionVacuum, upper camera, side reinspection cameraFault types each one catches and how rejects are handled.
Panel size1650–2550 × 990–1450 mmBox positions on each format.
Electrical supply / powerAC380 V, 3P/1N/1PE / 5 kWConnection details and running load.
Air pressure0.5–0.8 MPaVolume and dryness at the grippers.
Machine size, L × H × W / weight3060 × 2000 × 2300 mm / 1.7 TRoom to refill lids, guard the cell and service the robots.

Source: HORAD junction-box lid capping product page

03 · PVYard procurement analysis

What a closed box means for your order

  • Exact lid and box

    Share drawings, materials, latch design and how lids arrive at the station. Ask which grippers and tooling come with it and how model changes are made.

  • Seating and force

    Set the latch engagement or gap you accept and the force the lid and box can take. Ask how force is measured and what happens to a cracked or half-seated lid.

  • Fault samples

    Prepare missing, tilted, wrong-model, half-seated and broken-latch samples. Agree which check catches each and how each decision is logged.

Source: HORAD junction-box lid capping product page

04 · PVYard procurement analysis

Capping trial

  1. Fix the configuration

    Agree the lid and box models, feeder layout, robot tooling and where the robot may touch.

  2. Check latching

    Cap real parts, measure latch and gap results and look for damage, logging the settings used.

  3. Feed known faults

    Run pickup and latch defects past the vacuum, top camera and side camera, and confirm rejects leave the line and the station recovers.

  4. Starve and restart

    Watch the parallel robot motion and lid refilling during operation. Run out of lids, stop a capping cycle part-way and keep first-piece checks after every model change.

Source: HORAD junction-box lid capping product page

05 · PVYard procurement analysis

Lid capping questions

Does pressure feedback mean every latch has clicked in?

Pressure sensing controls the press. Define latch engagement and check it on its own.

How accurate are the three checks?

HORAD gives no detection rates. Measure them with known faulty lids.

Will it cap any lid?

HORAD names no supported lid list. Trial your exact box and lid pair.

Source: HORAD junction-box lid capping product page

TURN THIS INTO A CLEAR REQUEST

Ask about this product

Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.

Sources

Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.

HORAD junction-box lid capping product page ↗

Source check: 2026-10-11 · Dual-robot sequence, the three lid checks and the capping station's specification table.

Report a correction · How we prepare listings

Compare equipment for a related task

These entries are in the same category; check each one's specifications and configuration.

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.