PV MANUFACTURING EQUIPMENT
My account中国工厂入驻 Create RFQ

EQUIPMENT SERIES

HORAD module electrical-test station

Suzhou HORAD New Energy Equipment Co., Ltd. ↗

HORAD's electrical-test station clamps the test supply to the module, positive pole to the tooling and negative to the panel edges, then runs DC withstand-voltage, insulation-resistance and ground-resistance checks automatically.

HORAD lists the three tests, two grounding options, the failure alarm, panel sizes, utilities and machine size. Test voltages, limits, ranges, dwell times, accuracy and calibration are for you and HORAD to fix in the order. The station belongs to the testing and inspection end of the line, alongside label checks and grade sorting.

General illustration of testing & inspection equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.

START WITH YOUR PRODUCTION TASK

It suits a line that wants the three safety tests in one automatic station. Bring your module test plan and grounding choice, then ask HORAD to state in writing the tester ranges, accuracy, calibration and safety interlocks it will supply.

SOURCE-LINKED DATA

Published specifications

Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.

The manufacturer has not published a complete specification table for this entry. Request the exact offered drawing and operating limits.

See sources and check dates ↓

01 · Manufacturer information

Three tests in one station

The test supply connects its positive pole to the tooling and its negative pole to the module edges. Buyers can choose four-corner grounding, or foam grounding along all four sides for frameless panels. HORAD lists automatic DC withstand-voltage, insulation-resistance and ground-resistance tests, and a sound and light alarm flags any module that fails.

The product page is titled Testing Jig Return System, yet its text describes this tester. A plural-named HORAD page covers a crossbar tooling loop, which is a different machine. HORAD gives no test recipe, voltage range, resistance or current range, accuracy or compliance certificate here, so those figures belong in your enquiry.

Source: HORAD testing jig return system page

02 · Manufacturer information

Listed figures for the test station

Listed figures for the test station
ItemHORAD listsWhat your test plan adds
TestsDC withstand / insulation resistance / ground resistanceVoltage or current, pass limits, dwell and method for each.
GroundingFour-corner OR frameless four-side foamWhich option you buy and how contact is checked.
Failure signalSound and light alarmWhere failed modules go, what is recorded and how the line restarts.
Panel sizes1650 × 990–2500 × 1400 mmYour formats and junction-box connections.
Supply / machine powerAC380 V / 4 kWStation load only; the test output is a separate figure.
Air pressure0.6–0.8 MPaLitres per minute and filtration needed.
Machine size, L × H × W / weight3560 × 1820 × 2300 mm / 2 TGuarding, discharge and room for servicing.

Source: HORAD testing jig return system page

03 · PVYard procurement analysis

Three things to put in the enquiry

  • Your module test plan

    State the module build and, from your engineering or certification plan, the test methods, levels, times and pass limits the station must apply.

  • Measuring range and grounding

    Ask for tester ranges, resolution, accuracy and calibration certificates, plus a contact check. Pick four-corner or foam grounding to match framed or frameless product.

  • Operator safety and test records

    Request the guarding, interlocks, discharge sequence and fault recovery. Decide how each result is tied to a module serial and stored, since the alarm alone keeps no record. HORAD's dual-printer labeling station downstream can then carry that serial onto the frame and nameplate.

Source: HORAD testing jig return system page

04 · PVYard procurement analysis

Proving the tester on site

  1. Lock the test settings

    Fix methods, settings, the grounding option and the calibration package. Take test values from the plan and leave the 4 kW machine rating out of it.

  2. Measure known references

    Run reference samples with known values through each test and compare readings and pass or fail calls with the plan.

  3. Break the contact on purpose

    Try a missing ground, a poor contact and a wrong serial. Check that the result follows the right module, failures are set aside and half-finished tests are caught.

  4. Check discharge and interlocks

    Open guards and stop mid-test following your safety procedure. Keep calibration dates, tooling checks and change records afterwards.

Source: HORAD testing jig return system page

05 · PVYard procurement analysis

Questions about the test station

Is 4 kW the test voltage rating?

No. 4 kW is what the machine draws. HORAD lists no test levels or ranges, so ask for them.

Is it certified to a module standard?

HORAD cites no certificate or standard-specific test set. If your customer requires one, ask HORAD to name it in writing.

Does the fail alarm log results?

The alarm signals a failure. Linking results to serial numbers, keeping records and routing rejects should be written into the order.

Can I buy it together with the crossbar tooling loop?

Yes, as two items. They do different jobs and have their own machine tables, so each needs its own scope line.

Source: HORAD testing jig return system page

TURN THIS INTO A CLEAR REQUEST

Ask about this product

Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.

Sources

Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.

HORAD testing jig return system page ↗

Source check: 2026-10-11 · Electrical test functions, grounding options, alarm, panel range, utilities and machine size.

Report a correction · How we prepare listings

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.