EQUIPMENT SERIES
HORAD EVA strip-placement station
Suzhou HORAD New Energy Equipment Co., Ltd. ↗HORAD's EVA strip-placement station cuts EVA strips from roll stock, lays them on the glass and fixes the short ends with hot-stamping heads. The table gives 10–50 mm for cutting length and 990–1450 mm for material width, so a strip drawing from HORAD is the quickest way to see which direction each figure measures.
HORAD publishes no film thickness, no hot-stamping temperature or time window and no maximum roll size for this station. Ask for all three with the quotation.
General illustration of module assembly equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.
START WITH YOUR PRODUCTION TASK
Send HORAD your strip drawing and the EVA you actually use, agree the short-edge heat-fixing settings, then score the cut strips and their placement separately. For strips on all four module edges, HORAD's four-sided long strip placing machine is the related model.
SOURCE-LINKED DATA
Published specifications
Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.
The manufacturer has not published a complete specification table for this entry. Request the exact offered drawing and operating limits.
01 · Manufacturer information
How the strip placer cuts, lays and tacks
Film comes off the roll under constant tension, and a camera corrects its path before cutting. A servo stage squares the glass. The station then lays no more than three long strips and presses them down with three hot-stamping heads on each side of the short edge. Operators can move the stamping position and change the stamping time.
HORAD gives ±1 mm as placement accuracy. Cutting length reads 10–50 mm and material width reads 990–1450 mm. Together these suggest strips cut across wide stock, yet the page has no sketch of the axes. Ask HORAD which dimension runs along the feed and how it defines a long strip. The page also gives no cut tolerance and no heating recipe.
02 · Manufacturer information
EVA strip placer specification
| Item | HORAD figure | Settle for your order |
|---|---|---|
| Cutting length | 10–50 mm | A drawing showing the cut and feed directions. |
| Long strips placed | ≤3 | Strips per cycle or per module, and their layout. |
| Material width | 990–1450 mm | Roll cross-section and the widths that run together. |
| Placement accuracy | ±1 mm | Datum points and how the measurement is taken. |
| Supply / power | 380 V / 9 kW | Electrical load; heater temperature is a separate figure. |
| Air pressure | 0.6–0.8 MPa | Air flow and air quality. |
| Machine size, L × H × W | 5110 × 1880 × 2350 mm | Floor plan with room for roll loading and service. |
| Weight | 2.5 T | Floor loading and shipping. |
03 · PVYard procurement analysis
What the hot-stamped joint depends on
Strip and base film
Give HORAD the EVA grade and thickness of the strip and of the film it lands on. Agree with your process engineers how large the fused spot may be. If the base film comes from HORAD's EVA cutting and placing station, trial both films together.
Head layout and pressure
Mark where the three heads on each short-edge side touch down, relative to the strip and any keep-out zones on the module. Ask how hard they press and whether the film shifts.
Temperature and dwell
Request temperature and dwell limits proven on your own films. An adjustable position and time setting still needs a value that works for your stack. The fused spots also have to come through the laminator cycle without marking the module.
04 · PVYard procurement analysis
Trial plan for the strip placer
Fix the strip drawing
Sign off the strip and roll drawing, the strip count and the layout first. Read the 10–50 mm figure against that drawing.
Check cut pieces and position
Measure cut strips and their position on the glass for your formats, with full and nearly empty rolls. Set one tolerance for cutting and another for placement.
Run heat-fixing samples
Log film, temperature, dwell and contact settings. Look at tack strength, wrinkles and any module damage against limits you agreed beforehand.
Run a roll to its end
Let a roll run out, then restart and watch reject handling. Keep the approved film, head layout, settings and good samples on file.
05 · PVYard procurement analysis
EVA strip placer FAQ
Does ±1 mm describe cut length?
HORAD labels it placement accuracy. Agree a separate limit for cut length.
Is 10–50 mm the length of a long strip?
The page leaves the direction open. A strip drawing from HORAD will settle it.
Does HORAD supply a heat-fixing recipe?
Position and time are adjustable, but HORAD publishes no temperature or time values. Ask for settings proven on your EVA.
TURN THIS INTO A CLEAR REQUEST
Ask about this product
Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.
Sources
Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.
HORAD EVA strip-placement product page ↗
Source check: 2026-10-11 · Function list and specification table for the strip placer, including cut length, roll width and the short-edge heads.
Compare equipment for a related task
These entries are in the same category; check each one's specifications and configuration.