HORAD four-sided EVA strip placement station

Suzhou HORAD New Energy Equipment Co., Ltd. ↗

This HORAD machine puts EVA strips on all four edges of a module. It places along the long sides, switches to the short sides, and irons each strip with heat right after it goes down. Linear motors, servo drives and vision positioning move the heads.

HORAD says the machine suits all EVA strip materials now on the market, but lists no materials and gives no placement tolerance or cycle figure. Strip material is fed by hand.

General illustration of module assembly equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.

START WITH YOUR PRODUCTION TASK

Name the strip material and the edge pattern you need, then prove feeding, long-to-short switching, ironing and fault recovery on your own modules. Where only short-edge fixing is needed, compare it with HORAD's EVA strip placing station, which hot-stamps the short ends.

SOURCE-LINKED DATA

Published specifications

Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.

The manufacturer has not published a complete specification table for this entry. Request the exact offered drawing and operating limits.

See sources and check dates ↓

01 · Manufacturer information

All four module edges in one station

HORAD describes automatic EVA strip laying on the long and short sides of a module, with heat ironing straight after each strip is placed. One command switches the station between long-side and short-side work. Linear motors and servo drives carry the heads, and vision positioning guides them. It belongs to the layup section of a module line.

HORAD calls the machine suitable for every strip material currently sold, though it names none. Send your own film so HORAD can run it. Material loading is manual: HORAD stresses easy hand feeding, a breakage sensor and an alarm when material runs out, so plan an operator at the reels.

Source: HORAD four-sided strip placement product page

02 · Manufacturer information

Four-sided placer specification

Four-sided placer specification
ItemHORAD figurePin down before ordering
Module length / width1900–2520 / 950–1450 mmWhich length and width pairs run, and the edge pattern on each.
Cell and string types60 cells / 72 cells / MBB half-cell; cells 156–210 mmYour exact string and module layout.
Supply / power380 V / 21 kWInstalled load against running load.
Air pressure0.6–0.8 MPaFlow and air quality, which HORAD does not list.
Machine size, L × H × W6230 × 2310 × 2800 mmSpace for reel loading and maintenance.
Weight6.5 TFloor loading and crating for shipment.

Source: HORAD four-sided strip placement product page

03 · PVYard procurement analysis

Turning the all-materials claim into a test

  • Strip material

    Send film construction, thickness, strip widths, cut lengths and reel format. Ask HORAD to name the materials it has approved for this machine.

  • Corners and overlaps

    Draw the long-edge and short-edge strips, how they meet or overlap at the corners and where strips must stay out. Ask which tooling and recipe changes each pattern needs.

  • Ironing and hand feeding

    Set heat and contact conditions and list the operator's reel tasks. Agree what happens to the module when a strip breaks or a reel empties. Ironing should leave the strips ready for the laminator rather than partly cured, so share that recipe with HORAD.

Source: HORAD four-sided strip placement product page

04 · PVYard procurement analysis

Proving long sides, short sides and the switch

  1. Lock the pattern and film

    Approve the module and string design, the strip sections and a named list of compatible films.

  2. Measure every edge

    Check strip position, corners, overlaps and film condition on each approved format. Write numeric tolerances; a vision system on the spec sheet gives no number by itself.

  3. Time a real changeover

    Record every tooling move, recipe change, heat setting and first-piece check from long to short and back. HORAD's one-click description comes with no minutes, so measure them.

  4. Break a strip on purpose

    Empty a reel and snap a strip, then watch the alarm, refill, reject handling and restart. Agree safe operator access before a long production run.

Source: HORAD four-sided strip placement product page

05 · PVYard procurement analysis

Four-sided placer FAQ

Will my EVA film run on it?

HORAD claims broad material coverage without a list. Have HORAD run your actual film construction before you sign.

Does the machine load strip reels by itself?

HORAD describes manual material feeding. Check the configuration in your quotation.

How long does a long-to-short changeover take?

HORAD gives no duration. Time all tooling, recipe and first-piece steps at the trial.

Source: HORAD four-sided strip placement product page

TURN THIS INTO A CLEAR REQUEST

Ask about this product

Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.

Sources

Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.

HORAD four-sided strip placement product page ↗

Source check: 2026-10-11 · Edge-switching and heat-ironing functions, module size range and the machine's power, size and weight.

Report a correction · How we prepare listings

Compare equipment for a related task

These entries are in the same category; check each one's specifications and configuration.

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.