For solar panel string layup machines, begin your enquiry with glass dimensions, string layout and module template. Request a configuration-specific quotation and agree on positioning tolerance, changeover procedure, broken-cell criteria and bussing interfaces. Each listing shows the published values and the questions to confirm.
SC-Solar's ICB lead bender folds the module's output leads into position, three at a time, guided and checked by camera. The same station can apply high-temperature tape or cloth and stick a barcode label on the backsheet. The catalogue lists a 16-second cycle, 7.5 kW or less and glass from 1600–2500 × 900–1500 mm. Quote it with your lead drawing and the extras you need.
SC-Solar's second-glass layup station lifts the rear glass by vacuum, turns it over 180° and lowers it onto the prepared stack of a double-glass module. Servo axes handle alignment and feeding, with long-edge feed and four-side alignment. The catalogue lists a 12-second cycle and glass from 1650–2600 × 950–1450 mm. Quote it with your coated faces and stack height.
SC-Solar's string taper sticks short tapes across neighbouring strings so the layout cannot shift, controlling where each tape goes and how hard it is pressed. The catalogue lists a 14-second cycle that includes infeed and outfeed, tape lengths from 12 to 25 mm, widths of 5–10 mm and four-side alignment. Results depend on your tape and cells, so trial both.
SC-Solar's sheet placer cuts or punches small insulating pieces from roll stock, finds the target with a camera and sets each piece with a four-axis robot. It can also stick a barcode on the busbar and inspect the result in real time. The catalogue lists a 14-second cycle and modules from 1640–2550 × 990–1450 mm. Send your piece drawing and material grade to get a firm quote.
SC-Solar's integrated machine takes strings straight from the stringer, aligns the cells, lays them out with overlap and irons the busbars in one station. The catalogue lists a 40-second cycle, 35 kW peak and 15 kW average power, PLC and CCD vision control, and glass from 1640–2550 × 900–1450 mm. It suits lines short of floor space; compare it with separate stations on equal terms.
SC-Solar's auto-bussing station corrects cell position and welds the busbars that join the strings, with false-weld detection, flux monitoring and nozzle backflush cleaning. The catalogue lists a cycle of 15 seconds or less, 50 kW peak and 30 kW average power. Busbar punching and black-paint removal are extra-cost options, and the glass-size line needs a drawing before you quote.
SC-Solar's vision-guided layup machine picks finished cell strings and sets them on the glass, with flipping, cutting and repair feeding offered as options. The catalogue lists ±0.3 mm string placement, ±1 mm glass positioning and a 30-second cycle for twelve strings on modules up to 2520 × 1410 mm. Quote it with your string pattern and the stringer that will feed it.
SC-Solar's EVA repositioning station straightens film and glass before string layup, then tacks the film with four local hot-melt points so it stays in place on the way downstream. The catalogue lists ±1 mm correction accuracy and a cycle of 15 seconds or less for modules from 1650–2550 × 990–1450 mm. It prepares the stack; the full encapsulant cure still happens later in the laminator.
SC Solar's edge-finding film cutter cuts EVA, POE and backsheet material and lays it on the module. Web-deviation correction keeps the film on track, hot-melt roll changes run without stopping, and module size switches with one click. It lists ±1.5 mm cutting accuracy, a 12 s cycle and 8 kW power for modules of 1650–2550 × 990–1450 mm.
SC Solar's glass loader takes packed module glass off the pallet, separates and collects the interleaving paper, and cleans off static and dust before feeding the line. It handles modules of 1650–2550 × 990–1450 mm at a cycle of ≤12 s, draws 10 kW and weighs 6000 kg.
This is the loader at the head of the line, a different machine from SC Solar's second-glass layup station. Trial breakage and cleanliness on your own incoming glass.
The DHJ-C welds the busbars that join cell strings during module layup. Machine vision locates the strings and a flexible hold-down clamps them while welding. Yiheng names 60/72-cell, double-glass and half-cell modules with 5BB, 9BB and 12BB patterns, a cycle of ≤25 s and breakage under 1‰. Send your string layout and ribbon spec to get a quote.
HORAD's potting station mixes two-part AB adhesive and fills the three junction boxes on the back of a module. A screw-pump system meters the A and B parts, X/Y servo belts and a Z cylinder put the nozzle over each box, and a button or pulse signal triggers each shot with adjustable flow and time. It runs on 380 V and 3 kW.
Exact filters only match published specifications. Listings without that published value are not shown.
Selection guide
Layup places strings into the required module layout and hands the assembly to the next station. Selection is driven by glass dimensions, string spacing, handling and the module template. Ask for placement results with your string design as well as the machine-size range.
Inputs to prepare before shortlisting
Module template
Provide glass size, cell-string arrangement, spacing and positioning references. State which module variants must be accommodated at changeover.
Handling boundary
Define string arrival, glass alignment, reject handling and downstream bussing or transport. Ask who supplies carriers and station modifications.
Changeover and controls
Request the template-management procedure, recipe permissions and interface signals. Identify whether different string layouts need tooling changes.
Make quotations comparable
Compare a complete layup cycle with the same string and glass configuration. Request placement measurement definitions and handling-damage records. A robot cycle or nominal axis speed should not be substituted for completed module output.
Plan the acceptance test
Check agreed placement points on representative assemblies, then test template changeover and interrupted-cycle recovery. Record glass alignment, string condition and handover to the next station. Define the inspection sample and pass criteria before the trial.
Avoid this comparison mistake
Do not interpret electrical power rating as energy per module or a throughput guarantee. Those require measured cycle and operating conditions.