HORAD string-taping station

Suzhou HORAD New Energy Equipment Co., Ltd. ↗

This station tapes cell strings to the glass so they stay put on the way to lamination. Glass is squared by servo, tape points are placed by coordinates and a rotating module cuts each piece to a fixed length.

HORAD's original string-taping machine. The page gives a time per tape point and a refill time but no tape size range and no time for a whole module. Tape around the edge of the finished module is a separate job, done on HORAD's auto edge taping station.

General illustration of module assembly equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.

START WITH YOUR PRODUCTION TASK

It suits lines that want tape fixing automated right after layup. Send HORAD your tape and point pattern first, and get the full-module cycle in writing, along with a description of the refill step and the placement tolerance.

SOURCE-LINKED DATA

Published specifications

Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.

The manufacturer has not published a complete specification table for this entry. Request the exact offered drawing and operating limits.

See sources and check dates ↓

01 · Manufacturer information

How the taping station works

HORAD lists servo glass straightening, coordinate positioning of each tape point and a rotating cutter that cuts tape to a fixed length. Each point takes 0.9 seconds. To estimate a module cycle, multiply by the number of points in your pattern and add travel between points and glass transfer in and out.

The page also gives a refueling time of less than 60 seconds. On a taping machine this most likely means loading a new tape roll. Ask HORAD to describe the refill step, when the 60 seconds starts and stops, and whether the line keeps running during it.

Source: HORAD string-taping product page

02 · Manufacturer information

Published timing and utility figures

Published timing and utility figures
ItemHORAD figureAsk for
Time per tape point0.9 secondsFull-module time for your point count, travel and transfer.
Refill (refueling) timeLess than 60 secondsA written description of the roll change.
Module size entry1650–2550 × 990 × 1450 mmA drawing of the module formats accepted.
Supply / power380 V / 10 kWInstalled versus running load.
Compressed air0.6–0.8 MPaAir flow and quality.
Machine size, L × H × W3250 × 1800 × 1916 mmSpace for roll loading and service.
Weight1.7 TFloor load and transport package.

Source: HORAD string-taping product page

03 · PVYard procurement analysis

Match the tape, the pattern and lamination

  • Your tape

    Send width, thickness, adhesive type and roll and core size. Have your process team confirm the tape survives your lamination cycle.

  • Your point pattern

    Mark every tape position, cut length, allowed offset and any keep-out zone near contacts. The pattern sets both the cycle and the tooling. Tape points must also clear the gripper paths of an upstream layup gantry, so share both drawings with HORAD.

  • Hold and cleanliness

    Agree how firmly the tape must hold, how much residue is acceptable and how much the strings may shift, judged on your own glass and film.

Source: HORAD string-taping product page

04 · PVYard procurement analysis

Trial a full pattern and a roll change

  1. Fix tape and pattern

    Lock the tape grade, roll holder, cut lengths and coordinate references to your module drawing.

  2. Time a whole module

    Check cut length and placement of each piece, then time a complete module including travel and transfer.

  3. Change a roll

    Run a roll to empty, load a new one and restart. Count scrap and note any modules that need a second look.

  4. Send samples through lamination

    Laminate taped samples on your route, keep the good ones as reference and control any later tape change.

Source: HORAD string-taping product page

05 · PVYard procurement analysis

Buyer questions on string taping

Is 0.9 seconds the module cycle?

No. It is the time for one tape point. A module takes that time per point plus travel and glass transfer.

Does the refill happen without stopping?

HORAD only gives a time under 60 seconds. Ask whether it is a non-stop splice or a short stop for a manual roll change.

Which tape sizes does it take?

The data table lists none. Send your tape specification and ask HORAD to confirm it fits the cutter and roll holder.

Source: HORAD string-taping product page

TURN THIS INTO A CLEAR REQUEST

Ask about this product

Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.

Sources

Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.

HORAD string-taping product page ↗

Source check: 2026-10-11 · Servo positioning, fixed-length cutter, point time, refill time and utilities.

Report a correction · How we prepare listings

Compare equipment for a related task

These entries are in the same category; check each one's specifications and configuration.

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.