EQUIPMENT SERIES
HORAD jumper welding and Z-lead station
Suzhou HORAD New Energy Equipment Co., Ltd. ↗Busbar comes off a coil, is cut to length and bent into upward Z-shaped leads, which the station then welds to jumper wires on the module glass. A fume extractor sits above the welding area.
HORAD's original integrated welding machine. HORAD names full-screen and segmented patterns but gives no welding force, current or time and no joint strength figure.
General illustration of module assembly equipment, not a photograph of this model. Ask the manufacturer for current photographs and layout drawings of the configuration offered.
START WITH YOUR PRODUCTION TASK
It fits lines that want jumper welding and Z-lead forming done in one place on the glass. Share jumper and Z-lead drawings with HORAD and have the quotation state the joining method, process settings, joint test results and extraction rate. For back-contact modules, HORAD also offers a BC layup and soldering integrated machine that joins busbar while strings are laid out.
SOURCE-LINKED DATA
Published specifications
Values below are published by the manufacturer, each with the date its source was checked. Ask for the figures that apply to your configuration and material in the quotation.
The manufacturer has not published a complete specification table for this entry. Request the exact offered drawing and operating limits.
01 · Manufacturer information
Welding jumpers on the glass
HORAD says the station welds jumper wires directly on the glass module. It works with full-screen layouts and conventional segmented patterns, given as 3-cell and 4-cell. Busbar tape feeds from a coil and is cut to the length needed, and the machine bends upward Z leads and joins them to the jumpers. Strings reach the glass from a layup station before this welding step.
Control runs through a PLC and touchscreen. The module is aligned from four sides and templates can be switched for a new layout. HORAD also says material can be changed while running without stopping and fits a top-mounted extractor for spot-welding fumes. Process settings, extraction capacity and joint results are not published, so ask which joining method HORAD supplies for your stack.
02 · Manufacturer information
Published size and utility figures
| Item | HORAD figure | Ask for |
|---|---|---|
| Module size entry | 1650–2550 × 990 × 1450 mm | The accepted length and width pairs and patterns. |
| Supply / power | 380 V / 9 kW | Supply and load basis. Machine power says nothing about weld energy. |
| Compressed air | 0.6–0.8 MPa | Air flow, quality and what the weld actuators need. |
| Machine size, L × H × W | 5110 × 1880 × 2350 mm | Extra room for reels, extraction ducting and service. |
| Weight | 2.5 T | Floor load and transport package. |
03 · PVYard procurement analysis
Three things to specify together
Busbar and Z-lead shape
Send busbar material, coating, cross-section, reel and core size, cut lengths and a full Z-lead drawing. Ask for the bend radius range, springback and cut and bend tolerances.
Welding conditions
Ask which joining method HORAD supplies, the consumables and the heat, force or electrical settings for your materials. Get these figures from HORAD rather than working them out from the 9 kW rating.
Extraction and line handover
Agree how fumes are captured, the duct connection and filter maintenance. Specify supports and positioning so the welded array stays in place on the way out. The welded array then travels on toward lamination, so ask how it stays flat during that transfer.
04 · PVYard procurement analysis
Trial the finished jumper on your module
Match the pattern names
Check what HORAD means by full-screen and segmented against your module and its 3-cell or 4-cell layout. Lock materials, sizes and tooling.
Inspect cut, bend and weld
Run real coils and modules. Measure lead shape, mechanical and electrical joint results and any cell damage, with the settings recorded.
Change a coil while running
Let a coil run out, replenish or splice it and watch output continue. Count rejected pieces and agree how new material is logged.
Test extraction and faults
Check the extraction and safety setup, then trigger a positioning error and an interrupted weld. Save the accepted recipes and control later changes.
05 · PVYard procurement analysis
Buyer questions on jumper welding
Is 9 kW the welding energy?
No. It is the machine power. Ask HORAD for the joining method and its own process settings.
What soldering temperature does it use?
HORAD publishes no soldering or spot-welding recipe. Ask for one developed on your materials.
Does a running coil change mean zero scrap?
HORAD gives no scrap figure for the change. Run a coil change during the trial and count rejects.
TURN THIS INTO A CLEAR REQUEST
Ask about this product
Include the product-specific questions above and replace every bracket with your actual requirement. Save your edited text to your sourcing brief, then review it before submitting an enquiry. Saving a brief does not send it to a manufacturer.
Sources
Manufacturer information and our buying guidance are labelled section by section above. Each source below shows the date it was checked.
HORAD integrated welding product page ↗
Source check: 2026-10-11 · On-glass jumper welding, coil busbar feed, Z-lead forming, extraction and utilities.
Compare equipment for a related task