PV MANUFACTURING EQUIPMENT
My account中国工厂入驻 Create RFQ
EQUIPMENT DIRECTORY

Equipment finder — Page 7

Find machinery by production stage and the requirements of your line.

Plan the equipment scope

Identify the production step, cell or module format and output unit before comparing equipment. Use the listed source, scope and specifications to prepare a configuration-specific enquiry. Missing values are left unspecified and do not count as exact filter matches.

Read equipment buying guides or prepare a sourcing brief.

149 equipment listings

Clear filters

HORAD jumper welding and Z-lead station

HORAD's integrated welding station joins jumper wires to cell strings while the module sits on its glass. It cuts busbar from a coil to length, bends upward Z-shaped leads and welds them to the jumpers, with a fume extractor on top. HORAD names full-screen and 3-cell/4-cell segmented patterns and lists 380 V / 9 kW and 2.5 T. Ask for the welding method, settings and joint test results for your layout.

Suzhou HORAD New Energy Equipment Co., Ltd.
View equipment

Exact filters only match published specifications. Listings without that published value are not shown.

Build a useful equipment shortlist

Start with the workpiece and required process output, then choose a production stage. Open each listing to check whether it describes a model, a series, a component or a project application. Then ask the manufacturer to confirm suitability for your production recipe.

Use source values without filling unknowns

Keep original units and test conditions in your comparison. A missing specification remains a question for the supplier. Exact filters only match published values, so a hidden listing may simply lack that value. Review the original manufacturer page and ask for a configuration-specific sheet.

Compare the same supply boundary

List cutting, loading, inspection, handling, software and installation responsibilities for each offer. Keep accepted output distinct from nameplate speed and a line estimate distinct from one station’s capacity. Use the category selection guides to define representative samples and acceptance tests.

Read sourcing questions or prepare your requirements.

Analytics preferences

Allow optional audience measurement? Your choice can be changed in the footer. Essential account cookies remain necessary for sign-in and forms.