Find machinery by production stage and the requirements of your line.
Plan the equipment scope
Identify the production step, cell or module format and output unit before comparing equipment. Use the listed source, scope and specifications to prepare a configuration-specific enquiry. Missing values are left unspecified and do not count as exact filter matches.
This HORAD station cuts small EVA or EPE film patches, feeds them onto the module and also prints and places internal busbar barcode labels. Cutting, feeding and printing run in sync, and a camera picks and positions each label. HORAD quotes a fastest cycle of 12 seconds, utilization of 99% or more, 380 V / 8 kW and 2.5 T. Ask for patch sizes, the film build it accepts and placement tolerance.
This HORAD station checks the soldered lead wires inside a module junction box. A camera finds each lead and its weld, then a probe pushes on the lead while a pressure sensor reads the force, and software flags weak or thin joints and saves the data. HORAD lists 380 V / 8 kW, 2 T and module sizes from 1650 × 990 to 2500 × 1400 mm. Ask for the test force, pass limit and sensor calibration.
The HORAD string-taping station sticks short pieces of tape across cell strings on the glass to hold them in place before lamination. A servo straightens the glass, coordinates set each tape point and a rotary cutter cuts tape to a fixed length. HORAD quotes 0.9 seconds per point, under 60 seconds for a refill, 380 V / 10 kW and 1.7 T. Your module cycle depends on how many points your pattern needs.
HORAD's conventional gantry lifts completed strings and lays them onto the module glass, working from both sides at once. It handles horizontal and vertical layouts and AB string arrangements, with buffer and manual loading positions. HORAD lists 380 V / 22 kW, 4 T and a 3600 × 3230 × 2000 mm frame. No cycle time or placement tolerance is published, so ask for both with the quotation.
This HORAD machine does layup and busbar work in one frame: it arranges cell strings, corrects their alignment, feeds busbar from a roll and joins it, then inspects the array. It takes 166–230 mm cells, strings of 820–1260 mm and busbar 0.18–0.40 mm thick. BC panels and busbar folding or hot pressing come as modifications to order.
A gantry on linear motors picks finished cell strings and sets them on the glass, guided by vision. HORAD says it handles horizontal and vertical layup and AB or BC string layouts. String flipping and solder-strip cutting cost extra, so name them in the quotation. It draws 22 kW, weighs 4.5 T and covers modules up to 2520 × 1450 mm.
After the film is laid, this HORAD station uses a camera to find any offset, straightens the glass, brushes the EVA flat and heats it so it stays put. It runs on 8 kW, weighs 2 T and is far shorter than the cutting stations at 3680 mm long. HORAD's correction rule switches from one pass to several at 20 mm, so ask how it behaves at that point.
The precision version of HORAD's EVA station trims film on all four sides with an upper and a lower knife before laying it on glass. HORAD rates the fine cut at ±0.5 mm and describes placement as highly accurate, without a number. Roll changes take under 50 seconds. Choose it when sheet edges must be clean and square on every side.
HORAD's EVA station pulls film off the roll under constant tension, cuts it and lays it on the glass, with a stated laying accuracy of ±1.5 mm. A hot-melt splice swaps rolls in under 50 seconds while the line keeps running. It takes glass from 1650 to 2550 mm long and draws 18 kW. Quote it against your own film grade and roll size.
HORAD's glass-labeling station sticks a barcode on the underside of module glass, then rereads it to check the label is there and the printed data are right. It offers semi-paste and full-paste modes, takes single and double glass, and lists a fastest cycle of 12 seconds with utilization of at least 99.5%. Panels run 1640–2500 × 985–1450 mm.
HORAD's automatic glass-loading station picks glass sheets by robot, removes the interleaf paper and feeds glass into the module line. An axial-flow fan clears dust and an ion-air rod reduces static. Swinging-angle suction cups help prevent double picks. HORAD lists 380 V / 15 kW, 0.6–0.8 MPa air, a 9450 × 3500 × 2650 mm frame and a weight of 4.2 T.
HORAD's cell feeding system moves cell baskets between cell handling and the laser cutter or stringer, then sends empty baskets back on a lower conveyor. Each turnover jig holds 300 cells, and HORAD says one layout with eight manual loading positions feeds stringers for four module lines. The system is labelled for BC, TOPCon and HJT cells.
Exact filters only match published specifications. Listings without that published value are not shown.
Build a useful equipment shortlist
Start with the workpiece and required process output, then choose a production stage. Open each listing to check whether it describes a model, a series, a component or a project application. Then ask the manufacturer to confirm suitability for your production recipe.
Use source values without filling unknowns
Keep original units and test conditions in your comparison. A missing specification remains a question for the supplier. Exact filters only match published values, so a hidden listing may simply lack that value. Review the original manufacturer page and ask for a configuration-specific sheet.
Compare the same supply boundary
List cutting, loading, inspection, handling, software and installation responsibilities for each offer. Keep accepted output distinct from nameplate speed and a line estimate distinct from one station’s capacity. Use the category selection guides to define representative samples and acceptance tests.