Solar panel string layup machines — Page 2

Find machinery by production stage and the requirements of your line.

Selection considerations

Between stringer and laminator

Layup turns finished strings into a complete module stack. On the module assembly line it follows the cell stringers and feeds the module laminators; several stations listed here also work after lamination, before framing equipment. Read stringer throughput before balancing layup cycles against the stringer, and carry your stack definition into laminator specification.

Glass, film and backsheet

Suzhou HORAD and SC-Solar both cover the front end. Glass enters through HORAD's glass loader or SC-Solar's loader with paper separation, and HORAD's barcode labeler gives each module its identity. Film from encapsulation film suppliers is cut and laid by HORAD's standard or four-edge precision EVA stations or SC-Solar's film cutter with edge control; drifting film is corrected by HORAD's flattening unit or SC-Solar's pre-melt repositioner. HORAD adds EVA strips, four-sided strips and EVA/EPE patches. A backsheet cutter handles backsheet materials; double-glass modules close with HORAD's back-glass flipper or SC-Solar's second-glass flip, with a butyl dispenser for edge sealing.

Strings, bussing and leads

For placement, compare HORAD's robotic layup, conventional gantry and BC gantry with SC-Solar's vision-guided layup. Bussing with ribbon and busbar materials can be a separate station, such as SC-Solar's busbar welder or the DHJ-C from Yiheng Technology, or merged into HORAD's layup and busbar joiner or SC-Solar's integrated layup and bussing. Related steps place insulation sheets, weld jumpers and Z-leads and tape strings with HORAD's taper or SC-Solar's pressure-controlled taper. Leads are formed by HORAD's ICB bender or SC-Solar's version, then straightened and laser-cleaned.

After lamination, and how to compare

HORAD also lists edge taping, tape removal, corner trimming and the box steps: adhesive dispensing, mounting, soldering and AB potting of junction-box components. Many stations rely on cameras, so read machine vision in PV equipment. Give one owner the whole conveyor and signal plan, and check each station passes the module barcode onward, as traceability and MES interfaces explains. Judge cycle claims with breakage and throughput, and plan sign-off with FAT and SAT.

Plan the equipment scope

For solar panel string layup machines, begin your enquiry with glass dimensions, string layout and module template. Request a configuration-specific quotation and agree on positioning tolerance, changeover procedure, broken-cell criteria and bussing interfaces. Each listing shows the published values and the questions to confirm.

Read equipment buying guides or prepare a sourcing brief.

38 equipment listings

Clear filters

Exact filters only match published specifications. Listings without that published value are not shown.

Selection guide

Layup places strings into the required module layout and hands the assembly to the next station. Selection is driven by glass dimensions, string spacing, handling and the module template. Ask for placement results with your string design as well as the machine-size range.

Inputs to prepare before shortlisting

Module template
Provide glass size, cell-string arrangement, spacing and positioning references. State which module variants must be accommodated at changeover.
Handling boundary
Define string arrival, glass alignment, reject handling and downstream bussing or transport. Ask who supplies carriers and station modifications.
Changeover and controls
Request the template-management procedure, recipe permissions and interface signals. Identify whether different string layouts need tooling changes.

Make quotations comparable

Compare a complete layup cycle with the same string and glass configuration. Request placement measurement definitions and handling-damage records. A robot cycle or nominal axis speed should not be substituted for completed module output.

Plan the acceptance test

Check agreed placement points on representative assemblies, then test template changeover and interrupted-cycle recovery. Record glass alignment, string condition and handover to the next station. Define the inspection sample and pass criteria before the trial.

Avoid this comparison mistake

Do not interpret electrical power rating as energy per module or a throughput guarantee. Those require measured cycle and operating conditions.

Procurement guidance by PVYard Editorial, updated 2026-10-07. Turn the requirements into a sourcing brief →